City of Weed Bypass Water Supply Pipeline Project
7 Documents in Project
Summary
SCH Number
2016092058
Lead Agency
City of Weed
Document Title
City of Weed Bypass Water Supply Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Open space, roads/commercial, residential, no zoned/residential, commercial
Document Description
The project entails installation of approximately 3,500 ft of an 8-in bypass pipeline to convey water from South Weed to North Weed. Associated infrastructure would include installation of two supervisory valves. The bypass pipeline is needed to deliver water from South Weed to North Weed because North Weed has insufficient water supply available at City-owned sources. The project site is not identified as a hazardous waste facility, hazardous waste property, or hazardous waste disposal site.
Contact Information
Name
Ron Stock
Agency Name
City of Weed
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Weed
Counties
Siskiyou
Cross Streets
Various
Zip
96094
Total Acres
18.1+/-
Parcel #
various
State Highways
5,97
Railways
UP
Schools
Weed ES, Weed HS
Waterways
Boles Creek, Beaughton Creek, Black Butte Spring, etc.
Township
41N
Range
5W
Section
1,11,1
Base
MDMB
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Department of Transportation, District 2 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, District 1, California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW)
Development Types
Other (water line)
Local Actions
project approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, GHG
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.