Upper Quarry Amphitheater Renovation Phase 1

2 Documents in Project

Summary

SCH Number
2016092033
Lead Agency
University of California Santa Cruz
Document Title
Upper Quarry Amphitheater Renovation Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2016
Present Land Use
Campus support (under UC Santa Cruz 2005 Long Range development plan)
Document Description
The project would provide life safety, building code, accessibility and basic operational upgrades to an existing 1,600 seat outdoor amphitheater. The amphitheater, which was constructed in the late 1960s in a historic lime quarry, has been closed since 2006 due to disrepair. The project would allow the campus to re-open the facility for performances, events and casual daily use. Seating capacity would be expanded by about 170 by adding one row of seating within the existing footprint. As an optional element, pole-mounted flood lighting and an off-site emergency generator would be added to support evening use.

Contact Information

Name
Alisa Klaus
Agency Name
University of California Santa Cruz
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Hagar Dr/Steinhart Way
Zip
95064
Total Acres
1.5
Parcel #
001-011-13
State Highways
1, 17, 9
Schools
Westlake ES
Waterways
Moore Creek, Jordan Gulch, San Lorenzo River
Township
11S
Range
2W
Base
MD

Notice of Determination

Approving Agency
UC, Santa Cruz
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print