Lower Elkhorn Basin Levee Setback (Streambed Alteration Agreement No. 1600-2019-0204-R2)

10 Documents in Project

Summary

SCH Number
2016092015
Lead Agency
Water Resources, Department of (California Department of Water Resources)
Document Title
Lower Elkhorn Basin Levee Setback (Streambed Alteration Agreement No. 1600-2019-0204-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2020
Project Applicant
Mary Jimenez, DWR

Document Description
Amendment #1 adds the following features to the already approved Lower Elkhorn Basin Levee Setback project: widening of ditches 10, 12, and 13; fill of larger segments of the North and South Cross Canals; modifications to construction of new irrigation and drainage ditches; storm drain connections to existing ditches; modifications of culvert connections to existing ditches and canals; vehicle crossings over new and existing ditches; and grading of a detention pond.

Contact Information
Annalise Metzger
California Department of Fish and Wildlife
1701 Nimbus Road
Rancho Cordova, CA 95670

Phone : (916) 358-2885
annalise.metzger@wildlife.ca.gov

Location

Counties
Yolo
Regions
Northern California
Township
9N 10N
Range
03E04E
Other Location Info
Sacramento Bypass and East Levee of the Yolo Bypass

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The final environmental impact report prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019-0204 Amend 1 NOD-EIR   PDF 226 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print