Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016091071
- Lead Agency
- Monterey Peninsula Water Management District
- Document Title
- Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/1/2017
- Present Land Use
- Steelhead Rearing Facility/permanent grazing or farmland/greater monterey peninsula study area
- Document Description
- The district proposes to upgrade the Sleepy Hollow Steelhead Rearing facility to improve water supply intake reliability and intake water quality. The project includes integrating or modifying existing systems to rear juvenile steelhead to work with proposed improvements. Specific tasks include: removing an existing water intake structure in the bed of the Carmel River; installing a new intake structure and screen in the bed of the Carmel River; piping and other improvements to deliver water from the river to the facility; and constructing a recirculating aquaculture system in the floodplain adjacent to the active channel of the Carmel River to provide water clarification and filtration.
- Contact Information
-
Trish Chapman
CA State Coastal Conservancy
1515 Clay St., Suite 1000
Oakland, CA 94612
Phone : (510) 286-0749
Location
- Coordinates
- 36°26'36.63"N 121°42'57.51"W
- Counties
- Monterey
- Cross Streets
- ~1 mile downstream of the former San Clemente Dam location
- Zip
- 93924
- Total Acres
- 3.2
- Parcel #
- 417051004000
- Waterways
- Carmel River
- Township
- 17S
- Range
- 2E
- Section
- 23
- Base
- MD
- Other Location Info
- Carmel Valley
Notice of Determination
- Approving Agency
- CA State Coastal Conservancy
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 5 Harris Court, Bldg. G, Monterey, CA 93940
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.