Towne Pass Curve Correction Project (Streambed Alteration Agreement No. 1600-2018-0060-R6)

6 Documents in Project

Summary

SCH Number
2016091049
Lead Agency
Caltrans 9 (Bishop) (California Department of Transportation, District 9)
Document Title
Towne Pass Curve Correction Project (Streambed Alteration Agreement No. 1600-2018-0060-R6)
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Wildlife is executing Streambed Alteration Agreement number 1600-2018-0060-R6, pursuant to section 1602 of the Fish and Game Code to the permittee, Caltrans District 9, represented by Ms. Angela Calloway. The towne Pass Curve Correction project includes the removal of two 24 inch corrugated metal pipe culverts and appurtenant infrastructure located at 36.407N, 117.277W and 36.406N and 117.278W, and restoration of these locations. This activity is not expected to impact CDFW jurisdictional habitats. In addition, the project will include the installation of two new 24 inch corrugated metal pipe culverts with flared end sections and rock slope protection within the footprint of the existing/realigned roadway. The project will result in permanent impacts to 0.33 acres of talus and desert scrub habitat from the realignment of roadways within the 200-year flood plain of Emigrant Wash. Surface flows will not be present during construction activities. Equipment staging will be located in upland locations.

Contact Information
Jose Oseguera
CA Transportation Commission
1120 N Street, Suite 2230
Sacramento, CA 95814

916-653-7121

Location

Coordinates
36°24'25.6"N 117°16'37.9"W
Counties
Inyo
Cross Streets
SR 190 near Towne Pass
Zip
92328
Total Acres
6
Parcel #
032-040-01
State Highways
190
Waterways
Death Valley and Badwater Basin
Township
17S
Range
43E
Section
36
Base
21 MD
Other Location Info
Stovepipe Wells

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search