Bridge Maintenance Project - Capital Improvement Project No. 13816
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016091041
- Lead Agency
- City of Orange
- Document Title
- Bridge Maintenance Project - Capital Improvement Project No. 13816
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/14/2016
- Present Land Use
- Bridge locations cross either Santiago Creek or the Santa Ana River within urbanized portions of the City of Orange. Since the proposed improvements involve maintenance and repair work in existing bridges, there are no buildings or land uses within work area. Each of the bridge locations is paved and covered with impervious surfaces. The Santa Ana River Bicycle Path runs along the Santa Ana River. Paved roads provide access to the bridge locations. The bridge locations do not have any City zoning or GPD.
- Document Description
- The proposed improvements will repair the bridges, decks, side rails, sidewalks, and bridge girders; and clean and seal the deck for the bridges. The work area for the proposed bridge improvements are the bridges themselves. Grading activities will not be required; areas surrounding the bridge locations will not be disturbed.
- Contact Information
-
Jennifer Le
City of Orange
Lead/Public Agency
300 E. Chapman Avenue
Orange, CA 92666
Phone : (714) 744-7238
Location
- Cities
- Orange
- Counties
- Orange
- Cross Streets
- various
- Zip
- 92866
- State Highways
- SR 55, 22
- Railways
- Amtrak and Metrolink
- Airports
- John Wayne
- Waterways
- Santa Ana River and Santiago Creek
Notice of Determination
- Approving Agency
- City of Orange
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 300 East Chapman Avenue, Orange, CA 92866
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.