Bridge Maintenance Project - Capital Improvement Project No. 13816

2 Documents in Project

Summary

SCH Number
2016091041
Lead Agency
City of Orange
Document Title
Bridge Maintenance Project - Capital Improvement Project No. 13816
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2016
Present Land Use
Bridge locations cross either Santiago Creek or the Santa Ana River within urbanized portions of the City of Orange. Since the proposed improvements involve maintenance and repair work in existing bridges, there are no buildings or land uses within work area. Each of the bridge locations is paved and covered with impervious surfaces. The Santa Ana River Bicycle Path runs along the Santa Ana River. Paved roads provide access to the bridge locations. The bridge locations do not have any City zoning or GPD.
Document Description
The proposed improvements will repair the bridges, decks, side rails, sidewalks, and bridge girders; and clean and seal the deck for the bridges. The work area for the proposed bridge improvements are the bridges themselves. Grading activities will not be required; areas surrounding the bridge locations will not be disturbed.

Contact Information

Name
Jennifer Le
Agency Name
City of Orange
Contact Types
Lead/Public Agency

Location

Cities
Orange
Counties
Orange
Cross Streets
various
Zip
92866
State Highways
SR 55, 22
Railways
Amtrak and Metrolink
Airports
John Wayne
Waterways
Santa Ana River and Santiago Creek

Notice of Determination

Approving Agency
City of Orange
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print