Rosemead Reservoir and Booster Pump Station Replacement Project
2 Documents in Project
Summary
SCH Number
2016091035
Lead Agency
State Water Resources Control Board
Document Title
Rosemead Reservoir and Booster Pump Station Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2016
Present Land Use
Office/light industrial land use in the Rosemead GP (2010) and is zoned for light manufacturing (M-1)
Document Description
SWRCB as the lead agency will be issuing a water supply permit. The CA American Water Company, Rosemead, will demolish and remove a .75-million gallon partially-buried reservoir and booster pump station, the existing booster pumps, above ground piping, and electrical equipment. Once removed, the water company will construct a .75 million gallon replacement tank, 75 feet wide by 32.6 feet high, a booster pump station, with 3 vertical turbine pumps, pressure reducing valves, and associated appurtenances, including a small sodium hypochlorite building with drain pit and associated storage space, within the same area of land.
Contact Information
Name
Cindy Forbes
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Rosemead
Counties
Los Angeles
Cross Streets
Grand and Bartlett Ave
Zip
91770
Total Acres
3
Parcel #
5389-007-017
Township
1
Range
11
Section
7
Base
SB
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.