ArtCenter College of Design Master Plan

6 Documents in Project

Summary

SCH Number
2016091009
Lead Agency
City of Pasadena
Document Title
ArtCenter College of Design Master Plan
Document Type
FIN - Final Document
Received
Present Land Use
South Campus: Institutional Use/PS or IG-SP-2-HL-56 or CD-6 Zoning/Institutional (I) Designation; Hillside Campus: Institutional Use/PS & RS2-HD Zoning/Institutional (I) Designation
Document Description
ArtCenter was first established in Los Angeles in 1930 and moved to its current Hillside Campus (at 1700 Lida Street) in the City of Pasadena in 1976. In 2004, ArtCenter established a second campus also in Pasadena, referred to as the South Campus (at 950 S. Raymond Avenue). As the South Campus has grown and operations have shifted to this campus over time, the Hillside Campus and the south Campus have become increasingly connected. As a result, the Art Center has submitted one Master Plan application for a new 15-year Master Plan (the Project) that encompasses development on and comprehensively identifies vision for both the Hillside Campus and the South Campus. ArtCenter would focus growth on its South Campus, while providing for infrastructure improvements and building renovations to existing buildings, additional parking, installation of photovoltaic (PV) solar cells, and modifications to campus access. The Project would be implemented in two phases, with Phase I occurring between 2017 and 2022 and Phase II occurring between 2022 and 2032. It is anticipated that upon completion of the project, total enrollment within ArtCenter would increase from its current enrollment of approx. 2,000 full-time equivalent (FTE) students to a maximum of 2,500 FTE students and increase faculty/staff from 753 faculty/staff members to approx. 994 faculty/staff members between the two campuses.

Contact Information

Name
David Sinclair
Agency Name
City of Pasadena
Contact Types
Lead/Public Agency

Location

Cities
Pasadena
Counties
Los Angeles
Cross Streets
Arroyo Pkwy/Glenarm St. (South Campus); Lida St./ Linda Vista Ave. (Hillside Campus)
Zip
91103
Total Acres
6.68, 155.95
Parcel #
5720-007-023, 5720-007-025, 5720-007-026, 5720-008-011, 5720-008-012, 5705-002-006
State Highways
I-210, SR-110, SR-2
Railways
Metro Gold Line
Schools
Blair MS and HS
Township
1N
Range
12W
Section
33/18
Base
SBM

Notice of Completion

State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Resources Agency, Resources, Recycling and Recovery, California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, South Coast Region 5 (CDFW)
Development Types
Educational (Increase of 500 FTE students and 241 faculty/staff), Other (Create student housing, including 380 units, 1500 beds)
Local Actions
Master Plan, Rezone, Land Division (Subdivision, etc.), Development Agreement
Project Issues
Aesthetics, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Sewer Capacity, Solid Waste, Transportation, GHG, Cultural Resources, Utilities

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print