Westbridge School Project

2 Documents in Project

Summary

SCH Number
2016091004
Lead Agency
Coalinga, City of (City of Coalinga)
Document Title
Westbridge School Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project includes a request for approval of a Zoning Ordinance Text Amendment and a CUP to convert a vacant office structure into a special needs private school (Westbridge School). The project would utilize the existing on-site building and a perimeter fence would be constructed around the building. The school's hours of operation would be Monday through Friday, 8:00 AM to 5:00 PM and student enrollment would be limited to a total of 40 students enrolled in Pre-Kindergarten through 12th grades. The project would utilize the building as follows: 700 sq. ft. of office space, 800 sq. ft. of storage space, 500 sq. ft. for an assembly area, and 4,000 sq. ft. for classrooms. The project would utilize the 22 existing parking lot spaces and 10 existing on-street parking spaces. The project would be expected to employ a maximum of eight teachers and seven additional support staff members.

Contact Information
Sean Brewer
City of Coalinga
155 West Durian Ave
Coalinga, CA 93210

(559) 935-1533

Location

Coordinates
36°08'36.36"N 120°21'57.45"W
Cities
Coalinga
Counties
Fresno
Cross Streets
Washington St and California St
Zip
93210
Total Acres
0.5
Parcel #
072-053-195
State Highways
33/198
Airports
Coalinga Municipal
Schools
Various
Waterways
Warthan Creek
Township
20S
Range
15E
Section
32
Base
MDBM

Notice of Determination

Approving Agency
City of Coalinga
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
155 West Durian Ave., Coalinga, CA 93210

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search