Santa Ana River Mainstem Project Lower Santa Ana River
2 Documents in Project
Summary
SCH Number
2016089015
Lead Agency
Orange County Flood Control District
Document Title
Santa Ana River Mainstem Project Lower Santa Ana River
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2021
Document Description
Maintenance dredging in the Lower Santa Ana River. The State Lands Commission action is an approval of a 5-year General Lease – Dredging through October 20, 2026.
Contact Information
Name
Afifa Awan
Agency Name
California Lands Commission
Contact Types
Responsible Agency
Phone
Email
Location
Cities
Huntington Beach, Newport Beach
Counties
Orange
Regions
Southern California
Waterways
mouth of the Lower Santa Ana River at the Pacific Ocean
Other Location Info
Sovereign land located in the Lower Santa Ana River, Orange County
Notice of Determination
Approving Agency
Orange County Flood Control District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
Didn't find it online. The Orange County Flood Control District, certified the Supplemental Environmental Impact Statement (EIS) and Mitigation Monitoring Program and approved the project on November 28, 1989, and approved an Addendum on April 29, 2016. The California State Lands Commission approved this project based on the Supplemental EIS and Addendum as prepared for this project by the Orange County Flood Control District.
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Supplemental Environmental Impact Statement was being used as a CEQA document )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.