Addendum to Mitigated Negative Declaration for the Ione Small Hydroelectric Project - Minor Alteration

5 Documents in Project

Summary

SCH Number
2016082037
Lead Agency
Amador County Water Agency
Document Title
Addendum to Mitigated Negative Declaration for the Ione Small Hydroelectric Project - Minor Alteration
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2018
Present Land Use
Ag, utility/single family res ag/PS-Public services

Document Description
Since the mitigated negative declaration was adopted on September 22, 2016 and filed on september 23, 2016 for the Ione Small Hydroelectric Project, there have been minor alterations to the project's design. These include a) construction of a new permanent access road, b) modifications of proposed discharge pipelines from the hydroelectric faiclity from 3 to one and c) change in location of the flow meter box. Details of these proposes changes are described in the attached August 23, 2018 CEQA Addendum. One September 13, 2018, The Amador's Water Agency's Board of Directors approved the Addendum analyzing these minor changes to the project with no additional mitigation.

Contact Information
Darrel Evensen
Amador Water Agency
12800 Ridge Road
Sutter Creek, CA 95685

Phone : (209) 257-5245

Location

Coordinates
38°20'13.1"N 120°54'"W
Cities
Ione
Counties
Amador
Cross Streets
Hwy 104
Zip
95640
Total Acres
<1
Parcel #
011-180-027
State Highways
104
Railways
Amador Central
Schools
Ione ES, Ione MS
Township
6N
Range
10E
Section
31
Base
MDBM

Notice of Determination

Approving Agency
Amador Water Agency
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
12800 Ridge Road, Sutter Creek, CA 95685

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search