Feasibility Study and Remedial Action Plan for Habitat Area 2, Campus Bay Site

3 Documents in Project

Summary

SCH Number
2016082034
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Feasibility Study and Remedial Action Plan for Habitat Area 2, Campus Bay Site
Document Type
NOD - Notice of Determination
Received

Document Description
DTSC, pursuant to regulatory authority granted under Ch. 6.8, Section 25356.1 et Seq. of the Health and Safety Code has approved the Feasibility Study/Remedial Action Plan (FS/RAP) for cleanup of contaminated soils and sediments at Habitat Area 2 (HA-2) for the Zeneca/Former Stauffer Chemical Site. The purpose of the project is to protect people and the environment by remediating and prevent exposures to chemicals above screening levels in sediment, soil and groundwater. The recommended cleanup alternative in the FS/RAP includes excavation and off-site disposal of approx. 46,400 cubic yards of sediments and soil; import of approx. 26,600 cubic yards of cleanup backfill; in situ treatment of sediments containing moderate levels of proprietary pesticides with granular activated carbon; habitat restoration followed by monitoring and reporting; and institutional controls.

Contact Information
Lynn Nakashima
Department of Toxic Substances Control
700 Heinz Ave.
Berkeley, CA 94804

510-540-3839

Location

Coordinates
37°54'37.5912"N 122°19'46.5024"W
Cities
Richmond
Counties
Contra Costa
Cross Streets
South 51st St, Meade St
Zip
94804
Total Acres
9.2
Parcel #
560-010-046, -047, -027-005, -028-007, -050-022, 022-019, -023-026, -026-002
State Highways
580, 80
Railways
UPRR
Schools
Various
Waterways
SF Bay, Baxter Creek, Meeker Slough
Township
1N
Range
4W
Section
20,29

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
700 Heinz Ave., Berkeley, CA 94710

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project