Siemens Substation Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016082021
- Lead Agency
- Sacramento Municipal Utility District
- Document Title
- Siemens Substation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/17/2017
- Present Land Use
- Industrial
- Document Description
- SMUD proposes to construct a new substation that would occupy an approximately 0.16 acre site located at Siemens Industry, Inc. in Sacramento County, CA. The new substation would be located at 7338 French Rd, Sacramento, which is in south Sacramento County east of SR 99. The site is in an industrialized area south of Florin Rd and west of French Rd. The new Siemens substation would contain a single 20 MVA transformer and associated substation equipment. The project would also require a new telecommunications line and would reconfigure an existing cubicle on French Rd. This project would require new, local aboveground subtransmission and above and belowground distribution lines.
- Contact Information
-
Ammon Rice
Sacramento Municipal Utility District
Lead/Public Agency
6201 S St, MS H201
Sacramento, CA 95817
Phone : (916) 732-7466
Location
- Coordinates
- 38°29'30.4"N 121°23'36.9"W
- Counties
- Sacramento
- Cross Streets
- Apprx. 0.3 mi southwest of Florin Rd and French Rd
- Zip
- 95828
- Total Acres
- 0.26
- Parcel #
- 065-0030-021-0000
- State Highways
- 99
- Railways
- UPRR
- Schools
- Florin ES
- Waterways
- Elder Creek
- Township
- 7N
- Range
- 5E
- Section
- 2
- Other Location Info
- Florin
Notice of Determination
- Approving Agency
- Sacramento Municipal Utility District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 6301 S Street, Sacramento, CA 95817
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.