Kirker Pass Road Northbound Truck Climbing Lane Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-024-03 {ITP)]

2 Documents in Project

Summary

SCH Number
2016082019
Lead Agency
Contra Costa County
Document Title
Kirker Pass Road Northbound Truck Climbing Lane Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-024-03 {ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2019
Document Description
The Project includes construction of a northbound truck-climbing lane and paved shoulders for future Class II bike lanes. The Project will improve circulation for motorists and bicyclists along this stretch of road. The road is used by commuters and has heavy truck traffic. With sustained grades steeper than 8 percent, trucks are unable to match the .speed of other vehicles on the roadway, causing significant congestion and impacted traffic flow. Project elements include the following: roadway widening for the truck climbing lane; paved shoulders for future Class II bike lanes; relocation of drainage features; retaining wall construction; installation of signage and striping; construction of two bioretention areas; roadway conforms due to change In grade; and relocation of other existing roadside features. An open grade asphalt concrete overlay will be placed along the· southbound and northbound lanes. *SEE NOD FOR MORE DETAILS

Contact Information

Name
Jeanette Griffin
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Pittsburg
Counties
Contra Costa
Other Location Info
The Kirker Pass Road Northbound Truck Climbing Lane Project (Project) is located on Kirker Pass Road south of Highway 4, between Clearbrook Drive in the City of Concord, and the northernmost Hess Road intersection.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No