MGT 16-004 - MGT16-008 & EIS16-002 - Tahoe Donner Trails 5YIPlan

2 Documents in Project

Summary

SCH Number
2016082018
Lead Agency
Nevada County
Document Title
MGT 16-004 - MGT16-008 & EIS16-002 - Tahoe Donner Trails 5YIPlan
Document Type
NOD - Notice of Determination
Received

Document Description
Project consists of five Management Plans for those projects in the Tahoe Donner Association Trials Five-Year Implementation Plan (5YIPlan) located within sensitive environmental resource protection areas in the unincorporated area of Nevada County. The 5YIPlan is organized into 22 individual trail projects designed to improve legacy environmental conditions of existing trails and access roads, and construction of 12-miles of sustainable new single track shared-use trials, as well as two (2) parking lot/trailhead area improvement projects. The five proposed Management Plans are: 1) a Floodplain management Plan (MGT16-004); 2) A High Erosion Potential Management Plan (MGT16-005); 3) a Watercourses, Wetlands, and Riparian Areas Management Plan (MGT16-006); 4) a Significant Cultural Resources Management Plan (MGT16-007); and 5) a Rare, Threatened and Endangered Species and Their Habitat Management Plan (MGT16-008).

Contact Information
Patrick Dobbs
Nevada County
950 Maidu Avenue, Suite 170
Nevada City, CA 95959

530-265-1423

Location

Coordinates
39°21'10"N 120°14'37"W
Cities
Truckee
Counties
Nevada
Cross Streets
Northwoods Blvd
Zip
96161
Total Acres
3,000
Parcel #
various
State Highways
80
Schools
Tahoe/Truckee Unified
Waterways
S. Fork Prosser Creek, Trout Creek, Alder Creek
Township
18N
Range
15E
Section
35/36
Base
MD

Notice of Determination

Approving Agency
Nevada County Zoning Adminstrator
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
950 Maidu Ave., Suite 170, Nevada City, CA 95959-8617

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search