Decker Island Restoration Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-023-03 (ITP)]
7 Documents in Project
Summary
SCH Number
2016082013
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Decker Island Restoration Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-023-03 (ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2018
Present Land Use
Open space/Miscellaneous
Document Description
Project is a tidal restoration project proposed by DWR and located in Solano County along the Sacramento River. the project would enhance up to 140 acres of tidal wetland, associated high marsh, and riparian habitats, benefiting special-status species like Delta Smelt (Hypmesus transpacificus) and Chinook Salmon (Oncorhynchus thaleichthys). The project consists of three main elements: lowering a section fo levee, reconfiguring internal berms, and excavating a southern breach. Restoration would be accomplished with minimal in-water work and would utilize biological surveys, work windows, biological monitors, erosion control methods, and construction best management practices to avoid and minimize impacts to physical and biological resources.
Project will result in impacts to 22 acres of Giant Garter Snake (Thamnophis gigas; GGS) habitat including temporary impacts to 13 acres; the project will permanently remove 22 acres of GGS habitat. The project is expected to result in incidental take of GGS, which is designated as threatened species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.
Contact Information
Name
Jim Starr
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Rio Vista
Counties
Solano
Cross Streets
Solano
Zip
94571
Total Acres
140
Parcel #
0090-210-140
State Highways
160
Waterways
Sacramento River/Horseshoe Bend
Township
3N
Range
2E
Section
23
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.