Coastal Development Permit No. 2018-023 (OCWD Groundwater System expansion)

2 Documents in Project

Summary

SCH Number
2016081067
Lead Agency
Orange County Water District
Document Title
Coastal Development Permit No. 2018-023 (OCWD Groundwater System expansion)
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2018
Present Land Use
Wastewater Treatment Site/Industrial/Public

Document Description
Coastal Development Permit No. 2018-023 represent a request for the expansion of a groundwater replenishment system that includes a 25 ft. high, 4,700 sq. ft. pump station; two 33 ft. high flow equalizatioon tanks; pipeline rehabilitation on a vacant portion of the Orange County Sanitation District (OCSD). The coastal development permit is required to allow construction of the project within the non-appealable area of the coastal zone. The proposed groundwater replenishment system and facility rehabilitation within the OCSD site will upgrade an existing groundwater system and ensure a reliable supply of high-quality water to serve the needs of the community.

Contact Information
Joanna Cortez
City of Huntington Beach
2000 Main St., 3rd Floor
Huntington Beach, CA 92648

Phone : (714) 536-5271

Location

Coordinates
33°38'37"N 117°57'18"W
Cities
Huntington Beach
Counties
Orange
Cross Streets
22212 Brookhurst Street (Northeast corner of Brookhurst St and Pacific Coast Hwy)
Zip
92646
Total Acres
1
State Highways
1
Schools
Eder ES
Waterways
Santa Ana River, Pacific Ocean
Township
6S
Range
10W
Section
20
Base
Newport

Notice of Determination

Approving Agency
City of Huntington Beach Dept of Community Development
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search