Bautista Creek Channel Recharge Basin Expansion, Stage 50 Project

2 Documents in Project

Summary

SCH Number
2016081035
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Bautista Creek Channel Recharge Basin Expansion, Stage 50 Project
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2016
Present Land Use
Open space - water and open space - conservation
Document Description
The District, in partnership with the Lake Hemet Municipal Water District, is proposing to design, construct, operate and maintain the Bautista Recharge Basin expansion project. The recharge project is being designed to promote infiltration and increase recharge in the Hemet-San Jacinto Valley groundwater basin areas. The project includes construction of 6 earthen infiltration basins that will allow stormwater and surplus water to pond until it infiltrates into the ground. Water will enter the site and begin ponding within the southernmost basin and then be allowed to spillover via concrete spillway or concrete pipe structure, each which will be connected into the subsequent downstream basins flowing from south to north. A secondary source of water will be from surplus imported water via a pipeline from under Cedar Avenue that will be constructed as part of the project.

Contact Information

Name
Kris Flanigan
Agency Name
Riverside County Flood Control and Water Conservation
Contact Types
Lead/Public Agency

Location

Cities
Hemet
Counties
Riverside
Cross Streets
Ramona Expressway and Cedar Ave
Zip
92543
Total Acres
15
Parcel #
551-200-034
State Highways
74, 79
Schools
Bautista Creek ES
Waterways
Bautista Creek
Township
5S
Range
1E
Section
5,6,8

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.