Hannah Dam Replacement and Friant-Kern Canal Turnout Structure

2 Documents in Project

Summary

SCH Number
2016081028
Lead Agency
Kaweah Delta Water Conservation District
Document Title
Hannah Dam Replacement and Friant-Kern Canal Turnout Structure
Document Type
NOD - Notice of Determination
Received

Document Description
The project would continue to allow diversion capability from the Lower Kaweah River with the Hannah Dam Replacement and from the Friant-Kern Canal with the Friant-Kern Canal Turnout Structure. Specific project elements would include replacement of the Hannah Dam structure in the Lower Kaweah River, construction of a replacement diversion inlet structure from the Lower Kaweah River, construction of a turnout structure from the Friant-Kern Canal and construction of a gravity return structure to the Lower Kaweah River.

Contact Information
Mark Larsen
Kaweah Delta Water Conservation District
2975 N. Farmersville Boulevard
Farmersville, CA 93223

559-747-5601

Location

Coordinates
36°22'09"N 119°05'56"W
Counties
Tulare
Cross Streets
State Hwy 245 & Cottage PO Dr
Zip
93221
State Highways
245
Airports
Woodlake
Waterways
Kaweah River and St Johns River
Other Location Info
Lindcove

Notice of Determination

Approving Agency
Kaweah Delta Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
2975 N. Farmersville Blvd., Farmersville, CA 93223

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search