City of Ontario Recycled Water Distribution System Project

3 Documents in Project

Summary

SCH Number
2016081019
Lead Agency
City of Ontario
Document Title
City of Ontario Recycled Water Distribution System Project
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2016
Present Land Use
various
Document Description
The Project proposes to reduce its use of potable water, specifically for landscape irrigation applications. The proposed recycled water pipeline will provide a connection point to the existing recycled water pipeline with Euclid Ave. between the I-10 and Riverside Drive - and the parks surrounding the Euclid Avenue corridor with recycled water to be used for irrigation. In addition, a pipeline will be installed to connect two existing OMUC recycled water lines in Riverside Drive to provide recycled water to the service area north of Riverside Drive including the Deer Creek Loop, Lytle Creek Loop, and their surrounding common landscaping. The proposed Project will also construct a booster pump station with the Euclid Avenue median at Fourth Street and another at one of three proposed alternative pump station locations on South Bon View Ave.

Contact Information

Name
Richard Ayala
Agency Name
City of Ontario
Contact Types
Lead/Public Agency

Location

Cities
Ontario
Counties
San Bernardino
Cross Streets
Euclid Ave and Riverside Dr
Zip
91764
Total Acres
33
State Highways
I 10
Airports
Ontario

Notice of Determination

Approving Agency
City of ONtario
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print