Pure Water North City Morena Blvd Pump Station Project

13 Documents in Project

Summary

SCH Number
2016081016
Lead Agency
City of San Diego
Document Title
Pure Water North City Morena Blvd Pump Station Project
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2022
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The Project includes the construction of the North City Morena Blvd Pump Station that is designed to convey 32 million gallons per day (MGD) of wastewater to a 10.8-mile force main to convey wastewater to the North City Water Reclamation Plant. The Project will install five dual stage pumps and includes one standby pump. The new pump station also includes a screening facility, high purity oxygenation system, and large diameter piping for influent and overflows. Construction of the pump station will occur on a parcel that was purchased from the San Diego Humane Society. The parcel had infrastructure on it from the previous owner that is now demolished. Staging for the Project will be on the facility property and in the right-of-way.

Contact Information

Name
Chi-Hai Kalita
Agency Name
State Water Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
City of San Diego, San Diego
Counties
San Diego
Regions
Southern California
Other Information
The Project is located throughout San Diego County. Majority of the proposed Project occurs within developed land and/or along existing paved streets. A new Pure Water Facility and three pump stations would be located within the City of San Diego. Pipelines would traverse a number of local jurisdictions, including the City of San Diego; the City of Santee; the community of Lakeside and other areas in unincorporated San Diego County; and federal lands within Marine Corps Air Station Miramar. Specifically, the Miramar Reservoir Alternative is within the Poway, La Jolla, and Del Mar U.S. Geological Survey 7.5-minute quadrangle maps.

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
State Water Board, Division of Financial Assistance

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print