Ericsson Fiber Deployment Project - Phase 1 (Streambed Alteration Agreement No. 1600-2016-0024-R3)

Summary

SCH Number
2016079024
Lead Agency
Fish & Wildlife 3 (Napa) (California Department of Fish and Wildlife, Region 3)
Document Title
Ericsson Fiber Deployment Project - Phase 1 (Streambed Alteration Agreement No. 1600-2016-0024-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes horizontal directional drilling (HDD) at sites on Coyote Creek, Guadalupe River, Canoas Creek ,Los Gatos Creek, Alamitos Creek, and Ross Creek for the purposes of installing fiber-to-the-premises infrastructure. The bore will be1.5 times the pipe diameter. Eight-inch HDPE pipe with Standard Dimension Ratio 9 containing 6 (2-inch HDPE) conduits will be pulled. Each side of the pipe will be connected to a vault placed in a bore pit. To reduce the potential of a frac-out affecting sensitive resources, the entrance and exit points for drilling will be located at least 150 feet from riparian vegetation and depths below the invert of the stream will be 20 feet or greater. Gravel will be used to fill-in the bore pit. The CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0024-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Katerina Filatova/Ericsson, Inc. on behalf of Google Fiber CA, LLC.

Contact Information
Kristin Garrison
CDFW
7329 Silverado Trail
Napa, CA 94558

707-944-5534

Location

Cities
San Jose
Counties
Santa Clara

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No