Broadstone Oaks Crossing (Lake or Streambed Alteration Agreement No. 1600-2015-0062-R2)

Summary

SCH Number
2016079020
Lead Agency
City of Folsom
Document Title
Broadstone Oaks Crossing (Lake or Streambed Alteration Agreement No. 1600-2015-0062-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2016
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0062-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Elliot Homes, Inc, as represented by Price Walker. The project is limited to the construction of new a two-lane bridge over Alder Creek. Construction consists of a road crossing with a span length of 36 feet. The road width is proposed to be approx. 46 feet plus sidewalk of 6.5 feet, shoulder of 2 to 4.5 feet, not including the graded toe slopes extending out from the crossing structure. Surface material will consist of paved road on the crossing surface and native soil on the toe slopes. A precast con-span bridge system will be used to span the drainage and construct the bridge. Fill material will consist of native soil and concrete. The footing for the con-span system will be excavated and concrete will be poured to secure the footings. The con-span bridge design utilizes pre-cast headwalls. In addition, masonry retaining walls will be placed alongside the con-span structure. Native soil at both ends of the span will serve as abutment; the pre-fabricated components of the con-span bridge preclude the need for additional abutments.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Sacramento

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print