Lake or Streambed Alteration Agreement (Agreement) No. R1-08-0564 for Timber Harvesting Plan (THP 1-08-160MEN; "Shorter Cut THP"

Summary

SCH Number
2016079014
Lead Agency
Forestry and Fire Protection, Department of (Cal Fire)
Document Title
Lake or Streambed Alteration Agreement (Agreement) No. R1-08-0564 for Timber Harvesting Plan (THP 1-08-160MEN; "Shorter Cut THP"
Document Type
NOD - Notice of Determination
Received

Document Description
DFG is issuing an agreement for eight encroachments; a) Map Point 2, modify an existing 24 inch culvert crossing on a Class II watercourse by removing a downspout, armoring the inlet and outlet with rock and armoring the outlet side of the fill with rock, b) Map Point 6, replace an existing 12-inch culvert with a 24 inch culvert, armoring the inlet and outlet with rock, and installing a critical dip,, c) Map Point 8, bevel inlet of existing 48 inch culvert, armoring the outlet with rock and installing a critical dip, d) Map Point C, replace a damaged 24 inch culvert with a 36 inch culvert, armoring the inlet and outlet with rock, installing a critical dip and removing perched fill, e) Map Point W14, water drafting from a Class I watercourse (Elk Creek), f) Map Point W15, water drafting via gravity flow from a Class II watercourse to a storage tank, g) Map Point W16, water drafting via gravity flow from a Class II watercourse to a storage tank and h) Map Point W17, water drafting via gravity flow from a Class II watercourse to a storage tank.

Contact Information
Richard Macedo
CDFW
Northern Region 601 Locust Street
Redding, CA 96001

707-928-4369

Location

Counties
Mendocino

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search