BayCAP 2, City of Berkeley EV Charging Station
Summary
SCH Number
2016078034
Public Agency
City of Berkeley
Document Title
BayCAP 2, City of Berkeley EV Charging Station
Document Type
NOE - Notice of Exemption
Received
Posted
7/5/2016
Document Description
A dual-port Level 2 Charge Point electric vehicle charging station will be installed in front of the West Branch Berkeley Library within the public right of way for public use to support the adoption and use of EVs and their associated reductions in GHG emissions.
Contact Information
Name
Sarah Moore
Agency Name
City of Berkeley
Contact Types
Lead/Public Agency
Phone
Location
Cities
Berkeley
Counties
Alameda
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
This is a minor change to an existing facility. Installation of 1 EV charging station within the public ROW, with electrical connection to an existing facility is planned.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.