McKim Lincoln Meadows Residential Subdivision Project
5 Documents in Project
Summary
SCH Number
2016072046
Lead Agency
City of Lincoln
Document Title
McKim Lincoln Meadows Residential Subdivision Project
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2018
Present Land Use
The project site is currently vacant annual grassland with an existing Nevada Irrigation District irrigation ditch traversing through the center of the site. The project site currently has a Placer County General Plan Land Use designation of Rural Residential and is zoned by the County as Farm. The Lincoln General Plan designates the project site as Village; and the family residences, and farmland to the east; farmland, a decommissioned City of Lincoln landfill, and Viriginiatown Road to the south; and single family residences to the west.
Document Description
The 40 acre project will consist of placing fill material into wetland and vernal pool habitat in order to grade and develop a tentative subdivision map.
Contact Information
Name
Nicholas White
Agency Name
Central Valley Regional Water Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Lincoln
Counties
Placer
Cross Streets
Virginiatown Rd and Hungry Hollow Rd
Zip
95648
Total Acres
43.4
Parcel #
021-0231-018, -250-001
State Highways
SR 193
Railways
UPRR
Schools
Various
Waterways
Lincoln Canal, Auburn Ravine
Township
12N
Range
6E
Section
11
Base
MDBM
Notice of Determination
Approving Agency
Central Valley RWQCB
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.