Lincoln Meadows

5 Documents in Project

Summary

SCH Number
2016072046
Lead Agency
City of Lincoln
Document Title
Lincoln Meadows
Document Type
NOD - Notice of Determination
Received
Posted
3/19/2018
Present Land Use
The project site is currently vacant annual grassland with an existing Nevada Irrigation District irrigation ditch traversing through the center of the site. The project site currently has a Placer County General Plan Land Use designation of Rural Residential and is zoned by the County as Farm. The Lincoln General Plan designates the project site as Village; and the family residences, and farmland to the east; farmland, a decommissioned City of Lincoln landfill, and Viriginiatown Road to the south; and single family residences to the west.
Document Description
Certification of the Lincoln Meadows FEIR; Amendment of the General Plan to exclude the Lincoln Meadows project from Village 2; Pre-zoning of the Lincoln Meadows project and adjacent roadways to R-1 (single family residential) and OS (open space); and, Approval of a Tentative Subdivision Map to allow up to 144 low density single-family dwellings, landscape corridors, open space and associated improvements on approx. 40 acres located generally northeast of the intersection of Virginiaatown Road and Hungry Hollow Road (APN: 021-231-018).

Contact Information

Name
Steve Prosser
Agency Name
City of Lincoln
Contact Types
Lead/Public Agency

Location

Cities
Lincoln
Counties
Placer
Cross Streets
Virginiatown Rd and Hungry Hollow Rd
Zip
95648
Total Acres
43.4
Parcel #
021-0231-018, -250-001
State Highways
SR 193
Railways
UPRR
Schools
Various
Waterways
Lincoln Canal, Auburn Ravine
Township
12N
Range
6E
Section
11
Base
MDBM

Notice of Determination

Approving Agency
City of Lincoln
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print