Bridge Seismic Safety Retrofit Project in SAC and San Joaquin Counties, EA# 03-3F090 [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-
12 Documents in Project
Summary
SCH Number
2016072040
Lead Agency
California Department of Transportation, District 3
Document Title
Bridge Seismic Safety Retrofit Project in SAC and San Joaquin Counties, EA# 03-3F090 [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2019
Document Description
-2018-070-03 (ITP)]
The Project is limited to the retrofit of the existing Mokelumne River Bridges (Bridge No. 29-0197L/R) by replacing the existing multi-column bents with new outrigger bents and constructing new bent caps which will support the existing bridge decks. Each of the two bridges is supported by 20 existing bents (40 bents total). Each
new outrigger bent will be supported by two new pile shafts comprised of 4-ft (48-inch) diameter cast.in steel shell (CISS) concrete piles (a total of 40 outrigger bents supported by a total of 80 new pile shafts). Once the new outrigger bent systems have been constructed the columns of the existing bents will be removed.
*See NOD FOR MORE DETAILS
Contact Information
Name
Robert Stanley
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sacramento, San Joaquin
Other Location Info
Mokelumne River Bridge (Bridge No. 29-0197L/R) over the Mokelumne River and the associated floodplain on Interstate 5 (1-5) at Post Mile (PM) 49.78 at the San Joaquin/Sacramento County border
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.