SAC I-5 and San Joaquin/SAC 160 Bridge Seismic Retrofit Project, EA # 03-3F090

12 Documents in Project

Summary

SCH Number
2016072040
Lead Agency
California Department of Transportation, District 3
Document Title
SAC I-5 and San Joaquin/SAC 160 Bridge Seismic Retrofit Project, EA # 03-3F090
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2018
Document Description
Approval of Permit No. 19232, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream: To construct 24-inch diameter cast-in-steel-shel piles around the existing abutments each topped with a pile cap and a concrete crossbeam and tied to the existing abutment; construct a 108-inch diameter cast-in-drilled hole pile with a streel casing on each existing pier and topped with reinforced concrete collar and bonded to the existing pier support; attach gusset plates to truss members, remove and replace eight timber dolphins with steel-pile dolphins.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
SR 160 & Del Paso Blvd; I 5, Twin Cities Rd, SR 160 & River Rd
Zip
95816
Total Acres
various
Parcel #
various
State Highways
I 5, SR 160
Schools
Bates ES
Waterways
Mokelumne River and Sacramento River

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.