Public Works Integrated Master Plan

2 Documents in Project

Summary

SCH Number
2016071078
Lead Agency
City of Oxnard
Document Title
Public Works Integrated Master Plan
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
Note: Review Per Lead The purpose of the PWIMP is to provide a central planning document to guide improvements to the City's water infrastructure through the planning horizon (2040). Specifically, the PWIMP addresses future planning needs including infrastructure additions and upgrades for City's water, wastewater, recycled water, and stormwater utilities. The PWIMP builds upon previous planning efforts using a coordinated methodology, which will allow the City to take full advantage of potential linkages and synergies between the four water utility systems. In addition, the PWIMP is also coordinated with a streets plan in an attempt to allow timing of future streets upgrades to be tied together with infrastructure upgrades.

Contact Information

Name
Steve Brown
Agency Name
City of Oxnard
Contact Types
Lead/Public Agency

Location

Cities
Oxnard
Counties
Los Angeles, Ventura

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Emergency Services, California, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 6, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print