Sustainable Water Infrastructure Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8211-110
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016071056
- Lead Agency
- City of Santa Monica
- Document Title
- Sustainable Water Infrastructure Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8211-110
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/27/2018
- Present Land Use
- Oceanfront - element 1-parks and open space - 2, 3
- Document Description
- The City proposes to revise SWIP Element 3, which includes the construction of 2 underground stormwater control tanks. Specifically, SWIP Tank #1 was originally proposed to be located at Memorial Park. The city now proposes to revise the location of SWIP Tank 1 to beneath the existing Civic Center surface parking lot adjacent to SWIP Element 2 recycled treatment facility and to stormwater Tank 2. Both SWIP Tank ! and Tank 2 may be designed and constructed as a single combined structure resulting in a 4.5 million gallon capacity tank. An addendum to the approved 2016 MND was prepared and approved.
- Contact Information
-
Rachel Kwok
City of Santa Monica
Lead/Public Agency
1685 Main Street
Santa Monica, CA 90405
Phone : (310) 458-8341
Location
- Cities
- Santa Monica
- Counties
- Los Angeles
- Cross Streets
- Appian Way and Moomat Ahiko Way; Civic Center parking lot, memorial park
- Zip
- 90401
- State Highways
- 1
- Waterways
- pacific ocean
Notice of Determination
- Approving Agency
- City of Santa Monica
- Approved On
- Final Environmental Document Available at
- 1685 Main Street, Rm 212, Santa Monica, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.