California State Polytechnic University, San Luis Obispo Gold Tree Solar Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016071007
- Lead Agency
- California State Polytechnic University, San Luis Obispo
- Document Title
- California State Polytechnic University, San Luis Obispo Gold Tree Solar Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/26/2017
- Present Land Use
- Livestock grazing; areas suitable for ancillary activities and facilities, outdoor teaching and learning
- Document Description
- Project is comprised of an approx. 20 acre two to five megawatt photovoltaic solar energy facility which will consist of up to 1,500 tracking solar modules containing approx. ten solar panels per module, a new transformer, a maintenance/storage building generation connection to an existing electrical substation, and associated internal access and utilities.
- Contact Information
-
Perry Judd
California State University, Pomona
Lead/Public Agency
401 Golden Shore
Long Beach, CA 90802-4210
Phone : (805) 756-5765
Location
- Coordinates
- 35°19'3.18"N 120°41'32.3"W
- Cities
- San Luis Obispo
- Counties
- San Luis Obispo
- Cross Streets
- HWY 1
- Zip
- 93407
- Total Acres
- 40
- Parcel #
- 073-331-010, -251-001
- State Highways
- 1
- Railways
- UPRR
- Schools
- Cal Poly; ES
- Waterways
- Chorro Creek, Stenner Creek, tributaries
- Township
- 30S
- Range
- 12E
- Section
- 16
- Base
- MDBM
Notice of Determination
- Approving Agency
- Trustees
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 401 Golden Shore, Long Beach, CA 90802-4210
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.