Gateway Self-Storage and 7-Eleven

3 Documents in Project

Summary

SCH Number
2016062070
Lead Agency
Oakley, City of (City of Oakley)
Document Title
Gateway Self-Storage and 7-Eleven
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project includes a request for approval of a General Plan Amendment, Rezone, Tentative Parcel Map, Conditional Use Permit, and Design Review to construct a self-storage facility and a convenience store with a fueling station. The applicant is proposing to subdivide the 3.63-acre vacant site into two parcels to construct a 2.86 acre self-storage facility and a 0.77 acre 7-Eleven gas station. The self-storage facility will include a six one- and two-story storage buildings totaling 99,637 sf. In addition, a two-story manager's building consisting of a residential unit and office space will be located on-site. A total of 21 parking spaces will be provided for the self-storage facility. The 7-Eleven parcel will include a 3,795 sf 7-Eleven store, six multi-product dispenser fueling stations with a canopy, and 28 parking spaces ,including 12 at the fueling stations.

Contact Information
Joshua McMurray
City of Oakley
3231 Main Street
Oakley, CA 94561

(925) 625-7004

Location

Coordinates
37°58'56.68"N 121°44'53"W
Cities
Oakley
Counties
Contra Costa
Cross Streets
Laurel Rd and Empire Avenue
Zip
94561
Total Acres
3.63
Parcel #
053-071-050
State Highways
SR 4, 160
Railways
Southern Pacific
Schools
Mno Grant ES
Waterways
Sacramento River Delta, Contra Costa Canal
Township
2N
Range
2E
Section
34
Base
MDBM

Notice of Determination

Approving Agency
City of Oakley
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
3231 Main Street, Oakley, CA 94561

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search