Colma Creek Flood Control Channel Maintenance Project

3 Documents in Project

Summary

SCH Number
2016062032
Lead Agency
San Mateo County
Document Title
Colma Creek Flood Control Channel Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
10/28/2016
Present Land Use
Various
Document Description
The Colma Creek flood control channel provides flood protection for residents and businesses in the communities near the channel in South San Francisco, Colma, and Daly City. The primary objective of the project is to conduct maintenance activities as necessary along approximately 5.4 miles of the channel to provide adequate flood conveyance capacity. The project would primarily include removing localized sediment along the channel bed in a concrete-lined portion of the channel and repairing or replacing degraded culverts and blocked culvert outfalls. Other routine maintenance activities proposed include vegetation management; repair or maintenance of concrete/hardened channel banks and bed; installation and maintenance of trash capture devices; removal of accumulated debris; installation and repair of fences; repair of access roads; and graffiti removal.

Contact Information

Name
Mark Chow
Agency Name
San Mateo County
Contact Types
Lead/Public Agency

Location

Cities
Colma, South San Francisco
Counties
San Mateo
Cross Streets
Various
Zip
various
Total Acres
various
Parcel #
various
State Highways
101
Railways
Caltrain
Airports
SF Intl
Schools
Various
Waterways
Colma Creek
Section
variou

Notice of Determination

Approving Agency
San Mateo Control Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print