Downtown Tank Replacement Project
3 Documents in Project
Summary
SCH Number
2016062018
Lead Agency
City of Dunsmuir
Document Title
Downtown Tank Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2021
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes replacing the existing dilapidated water tank with a new 900,000-gallon storage tank and constructing a 15-foot wide by 110-foot long gravel access road from the west end of the existing Shasta Terrace driveway up to the new tank site, with an additional 12-foot-wide gravel perimeter around the new tank. The Project also includes construction of two subsurface pressure reducing valve stations and installation of approximately 975-feet of new 12-inch water pipeline along the Shasta Terrace Right-of-Way to Willow Street, realignment of the pipeline for improved maintenance access, and installation of one new fire hydrant.
Contact Information
Name
Gabriel Edwards
Agency Name
State Water Resources Control Board
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Dunsmuir
Counties
Siskiyou
Regions
Citywide
Cross Streets
Various
Zip
96025
Total Acres
+/-2.7
State Highways
5
Railways
UPRR
Schools
Dunsmuir HS, Dunsmuir ES
Waterways
Sac River
Township
39N
Range
4W
Section
24,25
Base
MDMB
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Siskiyou
Final Environmental Document Available at
5915 Dunsmuir Ave, Dunsmuir, CA 96025
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.