Montclair Basin Improvement Project

13 Documents in Project

Summary

SCH Number
2016061064
Lead Agency
Inland Empire Utilities Agency
Document Title
Montclair Basin Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2022
Document Description
The Project will improve stormwater capture at Montclair Basins 2 and 3 by constructing two new 8-foot wide by 6.5-foot deep (below channel floor) drop inlet structures within the San Antonio Creek channel and installing two approximately 144-foot-long pipelines to deliver the captured water to the two basins.

Contact Information

Name
Cedric Irving
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Bernardino
Regions
Southern California
Township
1S
Range
8W
Other Information
The Project is approximately located at U.S. Geological Survey (USGS) public lands map, San Bernardino Meridian, Township 1 South, Range 8 West, California. The Montclair Basins are located on the east side of the San Antonio Creek channel, and the new drop inlets from the channel to the basins are between Interstate Highway 10 and Moreno Street within San Bernardino County.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
6075 Kimball Avenue Chino, CA 91708

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print