The Consolidation and Rehabilitation of the Yermo Water System to Comply with State and Federal Water Quality Standards

2 Documents in Project

Summary

SCH Number
2016061052
Lead Agency
State Water Resources Control Board
Document Title
The Consolidation and Rehabilitation of the Yermo Water System to Comply with State and Federal Water Quality Standards
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2019

Document Description
The State Water Resources Control Board (SWRCB) is the lead agency for this project. The SWRCB Safe Drinking Water State Revolving Fund Program is providing funds for the project. The Liberty Utilities Corp. proposes to replace approximately 22,500-lineal feet of existing water pipeline within existing road right-of-ways, alleys, and easements within the town of Yermo. The proposed replacement pipeline will range in size from 6 inches to 12-inches in diameter. Appurtenant improvements include fire hydrants and valves as required to meet local fire ordinances and operational needs.

Contact Information
Bridget Binning
State Water Resources Control Board
1001 I Street 17th Floor
Sacramento, CA 95814

Phone : (916) 449-5600

Location

Counties
San Bernardino
Other Location Info
In the vicinity of Yermo, CA, San Bernardino County.

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
This is to certify the IS/MND for the project is available to the General Public at the SWRCB'S Headquarters' office in Sacramento.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination
2016061052   PDF 1221 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print