Yosemite Unified School District Water System Upgrade Project (Project); Drinking Water State Revolving Fund (DWSRF) NO. 2000567-002C

3 Documents in Project

Summary

SCH Number
2016061049
Lead Agency
Yosemite Joint Union High School District
Document Title
Yosemite Unified School District Water System Upgrade Project (Project); Drinking Water State Revolving Fund (DWSRF) NO. 2000567-002C
Document Type
NOD - Notice of Determination
Received
Posted
9/3/2019

Document Description
The proposed project is a water system upgrade that includes the construction of new water lines, installation of a storage tank (10,000 gallons), booster pumps, and the consolidation with an existing but separate water utility system. New waterline segments will be constructed within the school campus and in existing rights-of-way. Specifically, there will be 4,410 lineal feet of buried 4-inch and 6-inch water lines installed by trenching and 2,610 lineal feet of 4-inch water lines installed by horizontal directional drilling.

Contact Information
Bridget Binning
State Water Resources Control Board
Division of Financial Assistance 1001 I Street 16th Floor
Sacramento, CA 95814

Phone : (916) 449-5641

Location

Counties
Madera
Other Location Info
Project is located throughout the campus grounds at YUSD in Oakhurst, CA in Madera County (50200 Road 427 Oakhurst, CA 93644)

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
This is to certify that the ISMND with comments and responses and record of funding approval for the Project are available to the general public at the State Water Board, Division of Financial Assistance at the above address.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2016061049   PDF 752 K
Download CSV New Search