301 Spruce Street

2 Documents in Project

Summary

SCH Number
2016061023
Lead Agency
City of San Diego
Document Title
301 Spruce Street
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2023
Document Description
The Quince Apartments Project (project) proposes demolition of five existing commercial buildings and surface parking lots and one underground parking garage and construction of an in-fill mixed-use project, together with off-site utility work and sidewalks. The project would include 262 multi-family units (in studio, one-bedroom, two-bedroom, and three bedroom configurations) in an "L" shaped building configuration, with building heights stepping up from six stories to 17 stories. In accordance with the Complete Communities Housing Solutions Regulations (SDMC Section 143.1001 et seq.), 40 percent of the base density (22 units) would be provided as affordable units at a range of affordability. Commercial (retail and/or restaurant) space totaling approximately 5,631 square feet would be located on the ground level of the building. The project would include a backup generator, located in the southeast corner of the project, and a fire pump on the third level of the parking garage. Resident amenities would include indoor and outdoor amenity spaces on Level 2 (spa, co-working space, and gym), Level 10 (pool, pool deck, BBQ deck, community kitchen, and dining area), and Level 11 (pool, pool deck, and reception). The project would also include a large ground-floor plaza that offers opportunities for residents and neighbors to interact and allows views into Maple Canyon. Access to the project site would be from Third Avenue.

Contact Information

Name
Jeff Szymanski
Agency Name
City of San Diego
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide, Countywide
Cross Streets
Southeast Corner. Maple Canyon

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, 1222 First Avenue MS - 501, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print