Pacoima Wash Bikeway
3 Documents in Project
Summary
SCH Number
2016061006
Lead Agency
Mountains Recreation and Conservation Authority
Document Title
Pacoima Wash Bikeway
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2016
Document Description
The Pacoima Wash Bikeway would be a 3.25-mile long Class 1 bikeway stretching from the Lopez Earthen Dam and Debris Basin to the existing pedestrian and bicycle bridge at Haddon Ave. The proposed bikeway would include several design features including a 12 ft wide paved bikeway, new bridge crossings over the wash, fencing, increased access points, mileage markers, interpretive signage where appropriate, solar powered lighting, some pedestrian amenities such as seating, trash receptacles, and native landscape plantings. New pedestrian bridges across the channel will be constructed at approximately 8th Street, Telfair Ave and Gladstone Ave (subject to change).
Contact Information
Name
Liz Jennings
Agency Name
Mountains Recreation and Conservation Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of, San Fernando, San Fernando
Counties
Los Angeles
Cross Streets
Pacoima Wash from the Lopez Earthen Dam and Debris Basin to Haddon Ave
State Highways
I 15, 210, SR 118
Railways
Metro, SCRRA
Airports
Whiteman Airport
Schools
Various
Waterways
Pacoima Wash
Notice of Determination
Approving Agency
Mountains Recreation and Conservation Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.