Reservoir No. 2 Pump Station and Transmission Main Replacement Project

3 Documents in Project

Summary

SCH Number
2016058292
Lead Agency
Valencia Heights Water Company
Document Title
Reservoir No. 2 Pump Station and Transmission Main Replacement Project
Document Type
NOE - Notice of Exemption
Received

Document Description
The State Water Resources Control Board (SWRCB) is the responsible agency. The SWRCB's Safe Drinking Water State Revolving Fund (SDWSRF) Program is providing state funds for the project. The Upper San Gabriel Valley Municipal Water District proposes a construction project to replace approximately 1,500 linear feet of 14" ACP transmission main with 16" DIP or PVC, and replacement of existing booster pumps, electrical systems and buildings. The existing pump station includes two horizontal pumps with a total capacity of 2,100 gpm. The replacement booster station will install three vertical turbine pumpts each with a capacity of 700 gpm.

Contact Information
Bridget Binning
State Water Resources Control Board
1001 I Street, 16th Floor
Sacramento, CA 95814

916 341-5000

Location

Cities
West Covina
Counties
Los Angeles
Parcel #
8482-004-011

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302, Class 2
Reasons for Exemption
Replace of distribution mains, a pump station, and pumps involving neligible or no environmental impacts and do not include any of the Exceptions.