Oroville Wildlife Area Flood Stage Reduction Project (Lake or Streambed Alteration Agreement No. 1600-2017-0021-R2)

7 Documents in Project

Summary

SCH Number
2016052077
Lead Agency
Sutter Butte Flood Control Agency
Document Title
Oroville Wildlife Area Flood Stage Reduction Project (Lake or Streambed Alteration Agreement No. 1600-2017-0021-R2)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement NO. 1600-2017-0021-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sutter Butte Flood Control Agency. The Sutter-Butte Flood Control Agency proposes a series of hydraulic improvements, recreation enhancements, and habitat restoration at the Oroville Wildlife Area (OWA). The project includes the following activities: The construction of a rock gabion inflow weir, construction of a notch connection to the Feather River, placement of RSP along an outflow weir, the construction of a fish barrier berm, channel grading improvements, improvements of interior road crossings, public parking improvements, installation of a portable restroom slab, access improvements, construction of recreational and emergency bridges, and invasive species removal.

Contact Information
Juan Lopez Torres
CDFW
1701 Nimbus Road
Rancho Cordova, CA 95670

916-358-2951

Location

Coordinates
39°26'35"N 121°37'17"W
Cities
Oroville
Counties
Butte
Cross Streets
Pacific Heights Rd and SR 70 just east of Thermalito Afterbay outlet
Total Acres
1,500
Parcel #
025-350-001-004, -240-001, various
State Highways
SR 70
Waterways
Feather River
Township
18N
Range
3E

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1701 Nimbus Road, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search