Addendum to Final IS/MND-LGVSD Secondary Treatment and Recycled Water Plant Upgrade Project

5 Documents in Project

Summary

SCH Number
2016052009
Lead Agency
Las Gallinas Valley Sanitary District
Document Title
Addendum to Final IS/MND-LGVSD Secondary Treatment and Recycled Water Plant Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2019
Project Applicant
Las Gallinas Valley Sanitary District

Document Description
LGVSD's Modified Project consists of a new permanent laydown area to store HOPE pipe and other associated construction materials on top of wooden pallets as a part of constructing the Las Gallinas Secondary Treatment and Recycled Water Plant Upgrade Project. The permanent laydown area is situated south of the retention basins near the Las Gallinas Wildlife Ponds that are part of the ongoing operation of the WWTP. The laydown area does not encroach onto the existing road south of the retention basins and would not obstruct public use or any other uses of the area. The laydown area would not obstruct public use or any other uses of the area.

Contact Information
Michael Cortez
Las Gallinas Valley Sanitary District
Administration Bldg., 300 Smith Ranch Rd.
San Rafael, CA 94903

Phone : (415) 526-1518

Location

Cities
San Rafael
Counties
Marin
Other Location Info
300 Smith Ranch Road, San Rafael, CA 94903, CA (Marin County)

Notice of Determination

Approving Agency
Las Gallinas Valley Sanitary District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Las Gallinas Valley Sanitary District, Administration Building, 300 Smith Ranch Road, San Rafael, CA 94903

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2016052009 Addendum to Final   PDF 2434 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print