Groundwater Recharge Basin Project
4 Documents in Project
Summary
SCH Number
2016051059
Lead Agency
Lower Tule River Irrigation District
Document Title
Groundwater Recharge Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2017
Present Land Use
Ag AE40
Document Description
The proposed project is the construction of new groundwater recharge basins for periodic release of water through the LTRID canals. The project is being proposed to better serve water users within the Lower Tule River Irrigation District.
Contact Information
Name
Dan Vink
Agency Name
Lower Tule River Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Tulare
Counties
Tulare
Cross Streets
North of Hwy 190 adjacent to Ave 152, east of road 152
Total Acres
160
Parcel #
232-010-035, -036, -037
State Highways
190
Waterways
LTRID canals
Township
21S
Range
25E
Section
06
Base
MDBM
Notice of Determination
Approving Agency
Lower Tule River Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.