Rnacho Estates Mobile Home Fire Improvements Project (14-118-DP-CDP and 16-EIR-01)

3 Documents in Project

Summary

SCH Number
2016051057
Lead Agency
Goleta, City of (City of Goleta)
Document Title
Rnacho Estates Mobile Home Fire Improvements Project (14-118-DP-CDP and 16-EIR-01)
Document Type
NOD - Notice of Determination
Received

Document Description
The approved project FEIR Alternative 2b includes the upgrading two existing fire hydrants and the installation of two new fire hydrants at the mobile home park. New 8-inch water lines will be installed to serve the new and replaced fire hydrants within the park. Lastly, the project included the repaving of the existing hammerhead turnaround for the fire department. The project that was approved is not what was originally requested. The city Council chose to approve one of the Environmental Alternatives (Alternative 2b) contained within the FEIR. Alt. 2b met most of the project objectives while eliminating all the significant impacts.

Contact Information
Joe Pearson II
City of Goleta
130 Cremona Drive, Suite B
Goleta, CA 93117

805-961-7543

Location

Coordinates
34°4.23'8.09"N 119°8.87'8.60"W
Cities
Goleta
Counties
Santa Barbara
Cross Streets
Hollister Ave. and Coronado Drive
Zip
93117
Total Acres
19.11
Parcel #
079-210-058 and 079-442-023
State Highways
US 101
Railways
UPRR
Airports
Santa Barbara
Schools
UCSB
Waterways
Devereux Creek and Slough
Township
4N
Range
29W
Section
14
Base
SBBM

Notice of Determination

Approving Agency
City Council of City of Goleta
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
130 Cremona Dr., Suite B, Goleta, CA 93117

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes