CPC-2015-2956-VZC-DB-CUB-SPR

4 Documents in Project

Summary

SCH Number
2016051027
Lead Agency
City of Los Angeles
Document Title
CPC-2015-2956-VZC-DB-CUB-SPR
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2019
Document Description
Construction and operation of a new five-story 333,471 square-foot mixed-use development, comprised of 64,759 square feet of ground-floor and mezzanine-level grocery store and restaurant uses along Santa Monica Boulevard and 180 residential apartments (11 percent of the units, or 20 units, would be set aside for Very Low Income Households), over three levels of subterranean parking (up to 40.0 feet in depth), on a 2.6-acre (114,563 square-foot) vacant site. The Project would be a maximum of 62 feet in building height, with a maximum Floor Area Ratio ("FAR") of 3: 1. The Project would also include the installation of rooftop-mounted cellular antennas on 8-foot poles with supporting equipment cabinets. Excavation activities would result in the export of 152,000 cubic yards of soil from the site.

Contact Information

Name
Cecilia Lamas
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency

Name
Agency Name
City of Los Angeles
Contact Types
Project Applicant

Location

Cities
Los Angeles
Counties
Los Angeles
Cross Streets
11650 - 11674 West Santa Monica Boulevard; 1551 South Barry Avenue; 1560 South Barrington Avenue

Notice of Determination

Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print