Hurricane Point to Rocky Creek Safety Upgrades

3 Documents in Project

Summary

SCH Number
2016051011
Lead Agency
Caltrans 5 (San Luis Obispo) (California Department of Transportation, District 5)
Document Title
Hurricane Point to Rocky Creek Safety Upgrades
Document Type
NOD - Notice of Determination
Received

Document Description
The project will widen the southbound lane to 12 ft and southbound shoulders to 4 ft from post miles 58.32 to 58.36. Both sides of the highway will be widen to 12 ft lanes and 4 ft shoulders from post miles 58.36 to 59.22. New guardrail is proposed on the southbound shoulder from post miles 58.30 to 58.36 and from post miles 58.40 to 58.45. Guardrail replacement is proposed in spot locations identified by Caltrans Traffic Safety Division from PM 59.25 to 59.71. The historic Bixby Bridge lies within these limits, and the guardrail to bridge rail transitions at all four bridge corners are proposed to be replaced. No work will occur on the Bridge.

Contact Information
Julie McGuigan
California Department of Transportation, District 5
50 Higuera St
San Luis Obispo, CA 93401

805-549-3118

Location

Counties
Monterey
Cross Streets
Highway One
State Highways
hwy 1
Other Location Info
Big Sur

Notice of Determination

Approving Agency
Caltrans
Approved On
Final EIR Available Location
http://www.dot/dist05/projects/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No