Apple THP 1-15-033 SON

Summary

SCH Number
2016049008
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Apple THP 1-15-033 SON
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2016
Document Description
The project is limited to installation and removal of three temporary bridges; water drafting at four gravel bar water drafting sites and three off-site water holes; installation of a temporary pipe 6-inches or larger, adequate to handle water flow if wet at time of operations, over an unnamed Class II watercourse; a permanent culvert replacement over an unnamed Class II watercourses. The project is located on the North Fork Gualala River, Rockpile Creek and Buckeye Creek: Class I watercourse tributaries to the South Fork of the Gualala River, unnamed Class II watercourse tributaries to the South Fork of the Gualala River, and South Fork of the Gualala River, a Class I watercourse, in the County of Sonoma, State of CA. The CDFW is executing a Lake and Streambed Alteration Agreement No. 1600-2015-0140-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Henry Alden, Gualala Redwoods Timber, LLC.

Contact Information

Name
Julie Coombes
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Alameda
Other Location Info
Gualala River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print