Operation of San Gabriel Valley Water Company - Fontana Two Reservoirs and a Booster Pump

Summary

SCH Number
2016048337
Public Agency
State Water Resources Control Board
Document Title
Operation of San Gabriel Valley Water Company - Fontana Two Reservoirs and a Booster Pump
Document Type
NOE - Notice of Exemption
Received
Posted
4/25/2016
Document Description
The State Water Resources Control Board (SWRCB), as the responsible agency, will be issuing a water supply permit. In November-December of 2015, the San Gabriel Valley Water Company - Fontana installed two drain pipelines from the future reservoir location to the future detention basin location, totaling 235 feet of 16-inch pipeline. 1,460 feet of 24 inch piping was also installed to connect the future reservoirs to the future new pump station and to connect the existing main on Linden Avenue to the new reservoir location. In January the company installed a 101,000 gallon detention basin to collect storm water runoff and nay overflow from the soon to be built reservoirs.

Contact Information

Name
Sean McCarthy
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Rialto
Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, Class 1
Reasons for Exemption
The operation of existing private structures involving no expansion of use beyond that existing at the time of the lead agency's determination.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print