Water Distribution System Improvements

2 Documents in Project

Summary

SCH Number
2016048257
Lead Agency
Mount Shasta, City of (City of Mount Shasta)
Document Title
Water Distribution System Improvements
Document Type
NOE - Notice of Exemption
Received

Document Description
The State Water Resources Control Board is a responsible agency for this project. The City of Mt. Shasta proposes to conduct feasibility and planning studies, including a water utility rate study, leak detection, preliminary engineering report, environmental documentation, site surveying, and plans and specification for water distribution system improvements Anticipated improvements include about 23,000 ft of replacement pipeline.

Contact Information
Paul Eckert
State Water Resources Control Board
1001 I St, 16th Floor
Sacramento, CA 95814

(530) 926-7510

Location

Cities
Mount Shasta
Counties
Siskiyou

Notice of Exemption

Exempt Status
Other
Type, Section or Code
Title 14 - S: 15262
Reasons for Exemption
This project involves only feasibility and planning studies for possible future actions which does not require the preparation of an EIR or Negative Declaration but does require consideration of environmental factors. Pursuant to the California Department Fish and Wildlife (CDFW) Code, Section 711.4(d)(1), The CDFW environmental review filing fees do not apply.
Download CSV New Search